This design concept faces highway 130 and features an over-sized covered porch. The entrance leads into a large gathering area with a 400 seat worship center to the right and dedicated kids area to the left.

The master site plan includes room for expansion, additional parking, and ample green space. This allows us to make the best use of the 12 acres for years to come.

The floor plan above is the first draft and a revised floor plan will be available soon. The revisions will include relocating the restrooms, adding a kitchen and extra classrooms.

Projected Timeline

Summer 2021 – Initial design renderings.

Fall 2021 – Start design development and building plans.

December 2021 – Apply for rezoning and permits.

Spring 2022 – Begin construction.

Early 2023 – Open house!